  • Commissioning projects can introduce an array of challenges including land acquisition disputes, Central Transmission Utility (CTU) connectivity queues and load dispatch approvals adding months to timelines that were never modelled at bid stage. So are there any best contingency measures project developers can take after winning a tender before these circumstances arise?
  • Commissioned BESS projects have indicated a discrepancy in projected vs actual financial returns. These are caused by various factors such as degradation assumptions in bid models. So how are conversations with lenders nurtured yet create buy-in, and what does it mean for every other project currently seeking financing?
  • A generation of aggressively bid projects were structured on equipment costs, grid connection timelines and DISCOM payment reliability that no longer reflect market reality. At what point does an awarded project become unbuildable as structured, and who absorbs that cost?
Fireside chat

  • India’s lack of serious BESS incidents reflects early-stage deployment rather than an inherently safe operating environment. Commissioned capacity is set to accelerate sharply over the coming in the short to medium term. What safety frameworks need to be in place before scale arrives? And who is responsible for driving that agenda?
  • Lenders and insurers are increasingly requiring Battery Management System  (BMS) specification, thermal management design and operational procedures as explicit conditions before issuing commitment letters. How is the investment community’s growing focus on safety changing conversations at financial close, and are developers building to those requirements from the outset or retrofitting them at greater cost?
  • Meeting international fire safety standards with India’s own BIS certification requirements remains in development. What does a genuinely compliant Indian BESS project look like, and where do the gaps between international lender requirements and domestic standards currently sit?