- Shubhra Thakur
Shubhra Thakur
Director- Policy and Markets, Asia Pacific
LDES Council


Agenda
View full agendaPanel
- India’s BESS pipeline is almost entirely 2 to 4 hour duration. That is sufficient for peak shifting but will not be able to cater for the round-the-clock power it actually requires. How quickly does longer duration storage bridge India’s ability to continuously discharge as well as fulfilling its energy transition commitments?
- Sodium-ion requires no rare earth materials and carries a simpler supply chain than lithium-ion. What would it take to see sodium-ion in Indian battery development projects?
- Some technologies, including vanadium redox, flow batteries, iron-air and CO₂-based energy storage, are at different stages of commercial readiness. Some are approaching or have achieved commercial viability, while others still face economic challenges for Indian storage projects. So, which longer-duration technologies are ready now, and which still need a push?
Panel
- India curtailed 300 GWh of renewable energy in Q1 2026 from transmission constraints alone, according to a report from Ember Energy. Around 3 to 4 GW of two-hour storage at existing pooling stations could have absorbed most of it. 236 GW of plug-and-play BESS headroom already exists at major pooling stations. So, what regulatory and commercial changes unlock it?
- India has met only 80% of its annual transmission buildout targets over the past five years. 20 GW of renewable capacity now faces connectivity delays of more than four months this financial year. What does the commercial model look like for a developer prepared to move first?
- Generation-led transmission planning created the mismatch India is now managing. Co-optimised planning — where generation and transmission are developed together — is the structural fix. Which institutions need to change their behaviour to make that happen, and who can drive it?