Shreeyashi Ojha

Senior Reporter

Solar Media

Panel

  • India’s bilateral relationships in clean energy have become more increasingly prominent, but the flow of US capital into Indian storage specifically remains well below its potential. This is partly due to unfamiliarity with Indian project structures and perceived regulatory risk.  What do US investors need to see, in terms of project structure, regulatory clarity and return profile, to allocate capital to Indian storage at scale?
  • Rajasthan and Gujarat are India’s two largest renewable energy states and are actively seeking international investment partnerships. What are the investment pipelines available in other parts of the country and the practical steps required to access that capital through state-level partnerships?
Panel

  • With such large dependency in sourcing battery cells from China, lndia’s push towards building a domestic manufacturing industry for battery cells is a long road ahead as it looks to meet storage procurement targets. On what timeline can India realistically reduce that dependency to manageable levels, and what assumptions should developers and lenders be making in their models right now?
  • Battery cell prices experienced a 35–45% increase in less than seven months, making projects bid on falling-cost assumptions financially marginal or unviable. This session assesses how to build procurement and hedging strategies that protect project economics against further volatility.
  • The Production Linked Incentive (PLI) scheme has sought to incentivise deployment for advanced chemistry cell batteries. However, uptake is running behind schedule and several anchor applicants have not progressed as planned. Which PLI investments are real and on what timeline will Indian cells be available at volume? And what should project teams be planning for in the meantime?
  • There are signs of Chinese OEMs building manufacturing facilities: a development that could materially change the supply chain profile for lenders and developers if it proceeds. If Chinese manufacturer investments in India are credible, what would the timeline and scale look like, and how lenders are thinking about the bankability of domestically assembled versus imported cells?
Fireside chat

  • AI data centres, industrial decarbonisation and rapid residential growth are creating load profiles that India’s grid was never designed to serve. Is the storage pipeline being built today sized and configured for the demand India will have within the five-year deployment roadmap?
  • Hyperscalers with renewable energy commitments need clean power around the clock but cannot tolerate the outages and frequency events that characterise high-renewable-penetration states. Behind-the-meter storage paired with renewables is becoming a procurement requirement. Is the Indian market producing the 8-12 hour duration assets that data centre operators actually need?
  • States are increasingly writing firm, round-the-clock power delivery into procurement specifications as industrial and commercial load grows. Are developers committing to obligations their assets can reliably meet, or is a gap opening up between what contracts promise and what projects deliver?
Panel

  • Battery storage remains significantly more expensive per unit than solar alone — largely because components are imported and India has no domestic lithium supply. Pumped hydro and thermal storage are already demonstrating materially lower cost points in operational projects. So what would it take for pumped hydro and thermal storage to be treated as genuinely bankable, procurable alternatives — and what is currently standing in the way?
  • India has 6.2 GW of operational pumped hydro, 8.5 GW under construction and 64 GW under investigation. Coal mine areas — naturally hilly terrain with existing water sources — represent an entirely untapped pumped storage opportunity. What would it take to move pumped hydro in coal mines from pilot to pipeline?
  • Thermal storage delivers long-duration output without dependence on imported critical minerals and can be manufactured domestically. What would it take for thermal storage to be treated as a credible, procurable alternative within India’s storage policy framework? And who needs to champion it?
  • India’s 2030 storage targets were designed around batteries and pumped hydro. Mechanical, thermal and chemical storage are not factored into government planning numbers. Should India’s targets be reframed around duration and application rather than technology, and who has the authority to make that change?
  • Batteries, pumped hydro and thermal storage each have distinct strengths across response speed, duration and cost. What does an optimally balanced Indian storage mix look like by 2030, and are the procurement frameworks in place to build it?