Sanil Namboodiripad

COO

Indigrid

Mr. Sanil C. Namboodiripad, the Chief Operating Officer of IndiGrid, manages the operational portfolio of 10,000 km EHV Transmission lines, 16 EHV Substations, 1500 MW Solar Power Plants and 900 MWh Battery Energy Storage Systems.

He holds BTech. in Electrical & Electronics Engineering with MBA in Finance. He is a fellow of Institution of Engineers (India), a Chartered Engineer (India) and a fellow of International Society of Engineering Asset Management, Brisbane, Australia. He is also a registered Independent Director.    

He has over 35 years of rich experience in Operation & Maintenance (O&M) of Gas based combined cycle power plants, Coal fired power plants and Extra High Voltage (EHV) Transmission Systems. He started his career with NTPC Ltd. where he worked for 18 years in large gas turbine power plants at Kawas and Dabhol. Later he worked with Reliance Power in the Corporate Operations Group with main focus on establishing O&M strategies, Systems and Processes and Monitoring & Diagnostic systems for the power stations being setup by Reliance. He has also worked with Sterlite Power as Head – Asset Management of the pan India EHV transmission assets of Sterlite. He was also associated with Adani Transmission where he was managing the portfolio of 25 EHV substations and more than 11000 circuit kms of EHV Transmission lines including HVDC systems.

Prior to joining Indigrid, he was the Managing Director of ONGC Tripura Power Co. (OTPC – a Joint Venture of ONGC, GAIL and Tripura Govt.) OTPC owns and operates a 726 MW combined cycle power plant near Agartala and serves 25% of the electricity requirement of the North Eastern States. He was also holding the additional charge of MD of NETC, a JV company of OTPC and PGCIL  which owns and operates a 400 kV transmission network for evacuation of power from OTPC. During his tenure at OTPC, he also led the growth of OTPC by venturing into 200 MW Wind power plants in Odisha and formation of NGEAL ( New and Green Energy of Assam Ltd.), a JV of OTPC and Assam Power Discom for setting up 250 MW/500 MWh Battery Energy Storage Projects in the state of Assam.

Panel

  • Commissioning projects can introduce an array of challenges including land acquisition disputes, Central Transmission Utility (CTU) connectivity queues and load dispatch approvals adding months to timelines that were never modelled at bid stage. So are there any best contingency measures project developers can take after winning a tender before these circumstances arise?
  • Commissioned BESS projects have indicated a discrepancy in projected vs actual financial returns. These are caused by various factors such as degradation assumptions in bid models. So how are conversations with lenders nurtured yet create buy-in, and what does it mean for every other project currently seeking financing?
  • A generation of aggressively bid projects were structured on equipment costs, grid connection timelines and DISCOM payment reliability that no longer reflect market reality. At what point does an awarded project become unbuildable as structured, and who absorbs that cost?